NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Due to the lapse in federal government funding, NASA is not updating this website. We sincerely regret this inconvenience.

Back to Results
HVAC modifications and computerized energy analysis for the Operations Support Building at the Mars Deep Space Station at GoldstoneThe key heating, ventilation, and air-conditioning (HVAC) modifications implemented at the Mars Deep Space Station's Operation Support Building at Jet Propulsion Laboratories (JPL) in order to reduce energy consumption and decrease operating costs are described. An energy analysis comparison between the computer simulated model for the building and the actual meter data was presented. The measurement performance data showed that the cumulative energy savings was about 21% for the period 1979 to 1981. The deviation from simulated data to measurement performance data was only about 3%.
Document ID
19860018818
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Halperin, A.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Stelzmuller, P.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
August 12, 2013
Publication Date
May 15, 1986
Publication Information
Publication: The Telecommunications and Data Acquisition Report
Subject Category
Engineering (General)
Accession Number
86N28290
Funding Number(s)
PROJECT: RTOP 314-40-44-14-19
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available