NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
On-orbit prelaunch processing and refurbishmentAs the capabilities of the operational Space Station increase, emphasis will be placed on use of the Station for final development of missions, including the launch of large, complex, and reusable launch vehicles with destinations to geosynchronous orbit; lunar exploration or lunar development bases; and planetary exploration. This paper identifies and discusses the capabilities that would be needed to support the on-orbit prelaunch processing and refurbishing of a manned Mars vehicle launched from Space Station. The on-orbit launch vehicle prelaunch and refurbishment resource requirements needed to perform processing operations are projected from experience and data developed by the actual preparation of payloads for launch at the National Space Transportation System (NSTS) launch and landing site.
Document ID
19860062219
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Glaab, A. K.
(NASA John F. Kennedy Space Center Cocoa Beach, FL, United States)
Headley, D. E.
(NASA John F. Kennedy Space Center Cocoa Beach, FL, United States)
Rauch, R. J.
(NASA Kennedy Space Center; McDonnell Douglas Astronautics Co. Cocoa Beach, FL, United States)
Date Acquired
August 12, 2013
Publication Date
September 1, 1986
Subject Category
Space Transportation
Report/Patent Number
AIAA PAPER 86-2334
Report Number: AIAA PAPER 86-2334
Accession Number
86A46957
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available