Develop and test fuel cell powered on site integrated total energy systems. Phase 3: Full-scale power plant developmentThe third in a series of 4kW stacks, consisting of 24 cells of the 13 inch x 23 inch cell size, has been on test for about 1600 hours. This stack is similar to the first two stacks, which ran 7000 and 8400 hours, respectively. The present stack incorporates technology improvements relating to the electrolyte-matrix, the current-collector assembly, and a reduction in the number of cooling plates. Performance is currently averaging about 0.64 per cell at 161 mA sq cm.
Document ID
19870001911
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Kaufman, A.
(Engelhard Corp. Edison, NJ, United States)
Olson, B.
(Engelhard Corp. Edison, NJ, United States)
Pudick, S.
(Engelhard Corp. Edison, NJ, United States)
Wang, C. L.
(Engelhard Corp. Edison, NJ, United States)
Werth, J.
(Engelhard Corp. Edison, NJ, United States)
Whelan, J. A.
(Engelhard Corp. Edison, NJ, United States)
Date Acquired
September 5, 2013
Publication Date
March 17, 1986
Subject Category
Energy Production And Conversion
Report/Patent Number
QR-19
NASA-CR-175118
NAS 1.26:175118
DOE/NASA-0241-21
Report Number: QR-19
Report Number: NASA-CR-175118
Report Number: NAS 1.26:175118
Report Number: DOE/NASA-0241-21
Accession Number
87N11344
Funding Number(s)
CONTRACT_GRANT: DEN3-241