NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Due to the lapse in federal government funding, NASA is not updating this website. We sincerely regret this inconvenience.

Back to Results
Mars lander surveyThe requirements, issues, and design options are reviewed for manned Mars landers. Issues such as high 1/d versus low 1/d shape, parking orbit, and use of a small Mars orbit transfer vehicle to move the lander from orbit to orbit are addressed. Plots of lander mass as a function of Isp, destination orbit, and cargo up and down, plots of initial stack mass in low Earth orbit as a function of lander mass and parking orbit, detailed weight statements, and delta V tables for a variety of options are included. Lander options include a range from minimum landers up to a single stage reusable design. Mission options include conjunction and Venus flyby trajectories using all-cryogenic, hybrid, NERVA, and Mars orbit aerobraking propulsion concepts.
Document ID
19870008308
Acquisition Source
Marshall Space Flight Center
Document Type
Conference Paper
Authors
William R Stump
(Eagle Engineering (United States) Indian Trail, North Carolina, United States)
Gus R Babb
(Eagle Engineering (United States) Indian Trail, North Carolina, United States)
Hubert P Davis
(Eagle Engineering (United States) Indian Trail, North Carolina, United States)
Date Acquired
September 5, 2013
Publication Date
May 1, 1986
Publication Information
Publication: Manned Mars Missions Working Group Papers: Volume 1, Section 1-4
Publisher: National Aeronautics and Space Administration
Subject Category
Spacecraft Design, Testing and Performance
Meeting Information
Meeting: Manned Mars Missions Workshop
Location: Huntsville, AL
Country: US
Start Date: June 10, 1985
End Date: June 14, 1985
Sponsors: National Aeronautics and Space Administration
Accession Number
87N17741
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available