NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Manned Mars Mission Earth-to-Orbit (ETO) Delivery and Orbit Assembly of the Manned Mars VehicleThe contents of this section contain the initial concepts developed for the In-orbit assembly of a Manned Mars Vehicle and for the Earth-to-Orbit (ETO) delivery of the required hardware and propellant. Two (2)
Mars vehicle concepts (all-propulsive and all-aerobrake) and two (2) ET0 Vehicle concepts were investigated. Both Mars Vehicle concepts are described in Reference 1, and both ETO Vehicle concepts are described in Reference 2. The all-aerobrake configuration reduces the number of launches and time required to deliver the necessary hardware/propellent to orbit. Use of the larger of the 2 ETO Vehicles (HLLV) further reduces the number of launches and delivery time; however, this option requires a completely new vehicle and supporting facilities.
Document ID
19870008313
Acquisition Source
Marshall Space Flight Center
Document Type
Conference Paper
Authors
B Barisa
(Marshall Space Flight Center Redstone Arsenal, Alabama, United States)
G Solmon
(Marshall Space Flight Center Redstone Arsenal, Alabama, United States)
Date Acquired
September 5, 2013
Publication Date
May 1, 1986
Publication Information
Publication: Manned Mars Missions Working Group Papers: Volume 1, Section 1-4
Publisher: National Aeronautics and Space Administration
Subject Category
Astronautics (General)
Report/Patent Number
NASA-TM-89320-VOL-1
Meeting Information
Meeting: Manned Mars Missions Workshop
Location: Huntsville, AL
Country: US
Start Date: June 10, 1985
End Date: June 14, 1985
Sponsors: National Aeronautics and Space Administration
Accession Number
87N17746
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available