Budget availabilityA forecast of the total NASA budget required to achieve a manned mission to Mars at around the end of this century is described. A methodology is presented for projecting the major components of the NASA budget, including the NASA base, space flight, space station, Shuttle Derived Launch Vehicle, and the Manned Mars Mission. The NASA base, including administrative expenses, construction of facilities and research and development other than manned flight, is assumed to level off at the present (1985) level and remain constant at approximately $3.5 billion (constant fiscal year 1985 dollars). The budget for space flight, which consists of Shuttle research and development, operations, and tracking and data acquisition costs, is projected to decrease from approximately $4 billion in 1985 to just under $2.5 billion by 1989 and then level off. Planning profiles for three major programs are constructed: a permanently manned space station; a Shuttle Derived Vehicle; and a Manned Mars Mission. It is concluded that all of the programs can be conducted by the year 2002 with a 3 percent real growth rate in the NASA budget.
Document ID
19870008366
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Cyr, Kelley J.
(NASA Lyndon B. Johnson Space Center Houston, TX, United States)
Date Acquired
September 5, 2013
Publication Date
May 1, 1986
Publication Information
Publication: NASA. Marshall Space Flight Center Manned Mars Mission. Working Group Papers, V. 2, Sect. 5, App.
Subject Category
Economics And Cost Analysis
Accession Number
87N17799
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available