NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
OTV impacts and interactionsThe possible impacts and interactions of the agency's planning activities for the Orbit Transfer Vehicle (OTV) that is tentatively scheduled for initial operational capability in the late 1990's are identified. In general, the various Mars missions require vehicles of significant size and performance far greater than that provided by any OTV configuration currently being seriously considered. Therefore, interactions and impacts on these current concepts are minimal. These impacts and interactions fall into categories of technologies, systems, and operations. Each category is addressed.
Document ID
19870008372
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Roberts, Barney B.
(NASA Lyndon B. Johnson Space Center Houston, TX, United States)
Date Acquired
September 5, 2013
Publication Date
May 1, 1986
Publication Information
Publication: NASA. Marshall Space Flight Center Manned Mars Mission. Working Group Papers, V. 2, Sect. 5, App.
Subject Category
Astronautics (General)
Accession Number
87N17805
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available