NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Programmatic and technical parameters associated with Shuttle/Centaur development and operationsThe cost, schedule, technical, integration, and performance parameters associated with the development of the Shuttle/Centaur configurations, Centaur G and Centaur G-Prime, for compatibility with various elements of the STS are discussed. It is noted that the design concepts for these configurations involved the use of as much flight-proven hardware from the Atlas/Centaur program as possible. Forward and aft adapters were designed using graphite/epoxy composite structures for strength, weight, and thermal flow considerations. The Centaur integrated support system serves as the system interface for all systems between the Shuttle and Centaur from prelaunch through deployment of the Centaur in LEO. As a result of the Shuttle accident of January 28, 1986, the earliest possible flight for the Centaur mission appears to be December 1987.
Document ID
19870045202
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Clark, Harry J.
(Vitro Corp. Cocoa Beach, FL, United States)
Cristofano, Salvatore J.
(NASA Headquarters Washington, DC United States)
Date Acquired
August 13, 2013
Publication Date
January 1, 1986
Subject Category
Launch Vehicles And Space Vehicles
Accession Number
87A32476
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available