NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
The International Space Station complex - Promise and problemsThe current planning status of the International Space Station is reviewed from a NASA perspective, with a focus on aspects affecting the contributions of the international partners ESA, Japan, and Canada. The modifications implied by the shift from the previous double-keel configuration to the current phased-deployment (Block 1 - Block 2) approach are considered in detail and illustrated with drawings and a table listing the baseline assembly sequence. It is pointed out that the originally proposed non-NASA components can all be accommodated in the new configuration. The need for intermodule commonality of equipment form, fit, and function is discussed, and it is recommended that independent user boards be set up to select and coordinate experiments, and that the user boards of the partners open channels of cooperation and mutual support.
Document ID
19880047346
Acquisition Source
Legacy CDMS
Document Type
Reprint (Version printed in journal)
Authors
Halpern, Richard E.
(NASA Utilization Office of Space Station Washington, DC, United States)
Date Acquired
August 13, 2013
Publication Date
January 1, 1988
Publication Information
Publication: Space Technology - Industrial and Commercial Applications
Volume: 8
Issue: 1-2,
ISSN: 0277-4488
Subject Category
Astronautics (General)
Report/Patent Number
ISSN: 0277-4488
Accession Number
88A34573
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available