Space station electrical power system availability studyARINC Research Corporation performed a preliminary reliability, and maintainability (RAM) anlaysis of the NASA space station Electric Power Station (EPS). The analysis was performed using the ARINC Research developed UNIRAM RAM assessment methodology and software program. The analysis was performed in two phases: EPS modeling and EPS RAM assessment. The EPS was modeled in four parts: the insolar power generation system, the eclipse power generation system, the power management and distribution system (both ring and radial power distribution control unit (PDCU) architectures), and the power distribution to the inner keel PDCUs. The EPS RAM assessment was conducted in five steps: the use of UNIRAM to perform baseline EPS model analyses and to determine the orbital replacement unit (ORU) criticalities; the determination of EPS sensitivity to on-orbit spared of ORUs and the provision of an indication of which ORUs may need to be spared on-orbit; the determination of EPS sensitivity to changes in ORU reliability; the determination of the expected annual number of ORU failures; and the integration of the power generator system model results with the distribution system model results to assess the full EPS. Conclusions were drawn and recommendations were made.
Document ID
19890002431
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Turnquist, Scott R.
(Aeronautical Radio, Inc. Annapolis, MD, United States)
Twombly, Mark A.
(Aeronautical Radio, Inc. Annapolis, MD, United States)
Date Acquired
September 5, 2013
Publication Date
November 1, 1988
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
ARINC-RP-5149-11-01-4744
NAS 1.26:182198
NASA-CR-182198
Report Number: ARINC-RP-5149-11-01-4744
Report Number: NAS 1.26:182198
Report Number: NASA-CR-182198
Accession Number
89N11802
Funding Number(s)
PROJECT: RTOP 483-32-12
PROJECT: RTOP 483-31-02
CONTRACT_GRANT: NASA ORDER C-31003-J
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available