NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Evaluation of advanced geopotential models for operational orbit determinationTo meet future orbit determination accuracy requirements for different NASA projects, analyses are performed using Tracking and Data Relay Satellite System (TDRSS) tracking measurements and orbit determination improvements in areas such as the modeling of the Earth's gravitational field. Current operational requirements are satisfied using the Goddard Earth Model-9 (GEM-9) geopotential model with the harmonic expansion truncated at order and degree 21 (21-by-21). This study evaluates the performance of 36-by-36 geopotential models, such as the GEM-10B and Preliminary Goddard Solution-3117 (PGS-3117) models. The Earth Radiation Budget Satellite (ERBS) and LANDSAT-5 are the spacecraft considered in this study.
Document ID
19890006591
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Radomski, M. S.
(Computer Sciences Corp. Silver Spring, MD., United States)
Davis, B. E.
(Computer Sciences Corp. Silver Spring, MD., United States)
Samii, M. V.
(Computer Sciences Corp. Silver Spring, MD., United States)
Engel, C. J.
(NASA Goddard Space Flight Center Greenbelt, MD., United States)
Doll, C. E.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Date Acquired
September 5, 2013
Publication Date
September 1, 1988
Publication Information
Publication: Flight Mechanics(Estimation Theory Symposium 1988
Subject Category
Astrodynamics
Accession Number
89N15962
Funding Number(s)
CONTRACT_GRANT: NAS5-31500
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available