NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Lunar landing and launch facilities and operationsA preliminary design of a lunar landing and launch facility for a Phase 3 lunar base is formulated. A single multipurpose vehicle for the lunar module is assumed. Three traffic levels are envisioned: 6, 12, and 24 landings/launches per year. The facility is broken down into nine major design items. A conceptual description of each of these items is included. Preliminary sizes, capacities, and/or other relevant design data for some of these items are obtained. A quonset hut tent-like structure constructed of aluminum rods and aluminized mylar panels is proposed. This structure is used to provide a constant thermal environment for the lunar modules. A structural design and thermal analysis is presented. Two independent designs for a bridge crane to unload/load heavy cargo from the lunar module are included. Preliminary investigations into cryogenic propellant storage and handling, landing/launch guidance and control, and lunar module maintenance requirements are performed. Also, an initial study into advanced concepts for application to Phase 4 or 5 lunar bases has been completed in a report on capturing, condensing, and recycling the exhaust plume from a lunar launch.
Document ID
19890006596
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 5, 2013
Publication Date
June 15, 1988
Subject Category
Space Transportation
Report/Patent Number
NASA-CR-184715
NAS 1.26:184715
Report Number: NASA-CR-184715
Report Number: NAS 1.26:184715
Accession Number
89N15967
Funding Number(s)
CONTRACT_GRANT: NGT-21-002-080
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available