NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
On the relationship between matched filter theory as applied to gust loads and phased design loads analysisA theoretical basis and example calculations are given that demonstrate the relationship between the Matched Filter Theory approach to the calculation of time-correlated gust loads and Phased Design Load Analysis in common use in the aerospace industry. The relationship depends upon the duality between Matched Filter Theory and Random Process Theory and upon the fact that Random Process Theory is used in Phased Design Loads Analysis in determining an equiprobable loads design ellipse. Extensive background information describing the relevant points of Phased Design Loads Analysis, calculating time-correlated gust loads with Matched Filter Theory, and the duality between Matched Filter Theory and Random Process Theory is given. It is then shown that the time histories of two time-correlated gust load responses, determined using the Matched Filter Theory approach, can be plotted as parametric functions of time and that the resulting plot, when superposed upon the design ellipse corresponding to the two loads, is tangent to the ellipse. The question is raised of whether or not it is possible for a parametric load plot to extend outside the associated design ellipse. If it is possible, then the use of the equiprobable loads design ellipse will not be a conservative design practice in some circumstances.
Document ID
19890010754
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Zeiler, Thomas A.
(Planning Research Corp. Hampton, VA, United States)
Pototzky, Anthony S.
(Planning Research Corp. Hampton, VA, United States)
Date Acquired
September 5, 2013
Publication Date
April 1, 1989
Subject Category
Aircraft Design, Testing And Performance
Report/Patent Number
NASA-CR-181802
NAS 1.26:181802
Report Number: NASA-CR-181802
Report Number: NAS 1.26:181802
Meeting Information
Meeting: Gust Specialists Meeting
Location: Mobile, AL
Country: United States
Start Date: April 6, 1989
Accession Number
89N20125
Funding Number(s)
PROJECT: RTOP 505-63-21-04
CONTRACT_GRANT: NAS1-18000
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available