NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Extravehicular activity at geosynchronous earth orbitThe basic contract to define the system requirements to support the Advanced Extravehicular Activity (EVA) has three phases: EVA in geosynchronous Earth orbit; EVA in lunar base operations; and EVA in manned Mars surface exploration. The three key areas to be addressed in each phase are: environmental/biomedical requirements; crew and mission requirements; and hardware requirements. The structure of the technical tasks closely follows the structure of the Advanced EVA studies for the Space Station completed in 1986.
Document ID
19890010810
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Shields, Nicholas, Jr.
(Essex Corp. Huntsville, AL., United States)
Schulze, Arthur E.
(Lovelace Foundation for Medical Education and Research Albuquerque, NM., United States)
Carr, Gerald P.
(CAMUS, Inc., Huntsville AL., United States)
Pogue, William
(CAMUS, Inc., Huntsville AL., United States)
Date Acquired
September 5, 2013
Publication Date
January 22, 1988
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
NASA-CR-172112
NAS 1.26:172112
Report Number: NASA-CR-172112
Report Number: NAS 1.26:172112
Accession Number
89N20181
Funding Number(s)
CONTRACT_GRANT: NAS9-17779
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available