Development and refinement of test bed simulationsLewis Research Center of NASA, with support from Rocketdyne, was engaged in non-real time computer simulation effort for the Space Station Freedom Electric Power System (EPS) EASY5, a simulation package, is used as the primary tool for this activity. Early in the design of the EPS, two test beds were set up at Lewis. The Integrated Test Bed (ITB), that combines and upgrades these test beds, is in the planning stage. The test beds are designed to functionally represent many of the components of the EPS and their interconnections. The simulation effort is primarily directed towards these test beds. Model verification is performed using test bed data.
Document ID
19890018331
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Authors
Dravid, Narayan V.
(NASA Lewis Research Center Cleveland, OH, United States)
Miller, Dean R.
(NASA Lewis Research Center Cleveland, OH, United States)
Patterson, Alex G.
(NASA Lewis Research Center Cleveland, OH, United States)
Gombos, Frank J.
(Rockwell International Corp. Canoga Park, CA., United States)
Date Acquired
September 6, 2013
Publication Date
August 1, 1989
Subject Category
Spacecraft Propulsion And Power
Report/Patent Number
NASA-TM-102335
NAS 1.15:102335
E-5043
Report Number: NASA-TM-102335
Report Number: NAS 1.15:102335
Report Number: E-5043
Meeting Information
Meeting: Intersociety Energy Conversion Engineering Conference
Location: Washington, DC
Country: United States
Start Date: August 6, 1989
End Date: August 11, 1989
Sponsors: AIChE, ANS, ASME, SAE, IEEE, AIAA, ACS
Accession Number
89N27702
Funding Number(s)
PROJECT: RTOP 474-42-10
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available