Opportunities for space station assembly operations during crew absencePrior to Permanently Manned Capability (to be achieved approximately 21 months after the First Element Launch), the Space Station will be manned for less than 10 percent of its total staytime on orbit. The most intensive and critical Station assembly operations will occur during these early flights. Some robotic resources may be available to perform assembly operations while the Station crew is absent; however, the use of robotic devices for assembly operations during unmanned phases has not yet been adopted by the Space Station program. This paper studies the relevant aspects of teleoperated and autonomous assembly activities, and presents candidate assembly operations that could be performed during crew absence. From this analysis, the potential benefits of remote control of robotic resources can be weighed against any associated increase in cost and complexity that would accompany implementation of this capability.
Document ID
19890037962
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Parrish, Joseph C. (Ocean Systems Engineering, Inc. Falls Church, VA, United States)
Date Acquired
August 14, 2013
Publication Date
January 1, 1989
Subject Category
Astronautics (General)
Report/Patent Number
AIAA PAPER 89-0398Report Number: AIAA PAPER 89-0398