NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
STS payload design load evolutionPayload development and design load requirements for the U.S. National Space Transportation System (STS) are discussed. The STS requires that all payloads be compatible with STS verification loads which are calculated approximately one year prior to launch. Payload design and all verification testing are completed prior to this final load cycle. Various approaches to preliminary design loads, load updates, and test load definitions and also to STS model and forcing functions revisions are presented.
Document ID
19900001673
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Hamilton, David A.
(NASA Lyndon B. Johnson Space Center Houston, TX, United States)
Wade, Donald C.
(NASA Lyndon B. Johnson Space Center Houston, TX, United States)
Date Acquired
September 6, 2013
Publication Date
January 1, 1989
Publication Information
Publication: ESA, Spacecraft Structures and Mechanical Testing
Subject Category
Spacecraft Design, Testing And Performance
Accession Number
90N10989
Distribution Limits
Public
Copyright
Other
Document Inquiry

Available Downloads

There are no available downloads for this record.
No Preview Available