NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Automated telescope schedulingWith the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.
Document ID
19900006547
Acquisition Source
Legacy CDMS
Document Type
Preprint (Draft being sent to journal)
Authors
Johnston, Mark D.
(Space Telescope Science Inst. Baltimore, MD, United States)
Date Acquired
September 6, 2013
Publication Date
August 1, 1988
Subject Category
Astronomy
Report/Patent Number
NAS 1.26:186279
PREPRINT-SERIES-306
NASA-CR-186279
Report Number: NAS 1.26:186279
Report Number: PREPRINT-SERIES-306
Report Number: NASA-CR-186279
Accession Number
90N15863
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available