NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Space station contamination control study: Internal combustion, phase 1Contamination inside Space Station modules was studied to determine the best methods of controlling contamination. The work was conducted in five tasks that identified existing contamination control requirements, analyzed contamination levels, developed outgassing specification for materials, wrote a contamination control plan, and evaluated current materials of offgassing tests used by NASA. It is concluded that current contamination control methods can be made to function on the Space Station for up to 1000 days, but that current methods are deficient for periods longer than about 1000 days.
Document ID
19900008358
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Ruggeri, Robert T.
(Boeing Aerospace Co. Seattle, WA, United States)
Date Acquired
September 6, 2013
Publication Date
February 9, 1987
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
NAS 1.26:179323
NASA-CR-179323
Report Number: NAS 1.26:179323
Report Number: NASA-CR-179323
Accession Number
90N17674
Funding Number(s)
CONTRACT_GRANT: NAS8-36432
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available