NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Operational requirements and the geostationary platformFor 22 years (from ATS-1 to GOES-H) a single technology has dominated imaging from geosynchronous altitudes. In 1990, with the scheduled launch of GOES-I, a major change will occur which will in turn open the way for the Geostationary Platform. The need for improved observations of severe storms has led NOAA to a decision to replace spinning geostationary spacecraft with a three-axis-stabilized type (non-spinning) vehicle already common among communications spacecraft and demonstrated by INSAT. Also, the current spin-scan imager with sounder channels will be replaced by separate instruments capable of independent aiming. The advantages and challenges of the changes are discussed.
Document ID
19900009934
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Sparkman, James K., Jr.
(National Oceanic and Atmospheric Administration Washington, DC, United States)
Date Acquired
September 6, 2013
Publication Date
July 1, 1989
Publication Information
Publication: NASA, Langley Research Center, Earth Science Geostationary Platform Technology
Subject Category
Spacecraft Design, Testing And Performance
Accession Number
90N19250
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available