Aeropropulsion facilities configuration control: Procedures manualLewis Research Center senior management directed that the aeropropulsion facilities be put under configuration control. A Configuration Management (CM) program was established by the Facilities Management Branch of the Aeropropulsion Facilities and Experiments Division. Under the CM program, a support service contractor was engaged to staff and implement the program. The Aeronautics Directorate has over 30 facilities at Lewis of various sizes and complexities. Under the program, a Facility Baseline List (FBL) was established for each facility, listing which systems and their documents were to be placed under configuration control. A Change Control System (CCS) was established requiring that any proposed changes to FBL systems or their documents were to be processed as per the CCS. Limited access control of the FBL master drawings was implemented and an audit system established to ensure all facility changes are properly processed. This procedures manual sets forth the policy and responsibilities to ensure all key documents constituting a facilities configuration are kept current, modified as needed, and verified to reflect any proposed change. This is the essence of the CM program.
Document ID
19900012083
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Authors
Lavelle, James J.
(NASA Lewis Research Center Cleveland, OH, United States)
Date Acquired
September 6, 2013
Publication Date
March 1, 1990
Subject Category
Quality Assurance And Reliability
Report/Patent Number
NAS 1.15:102541
NASA-TM-102541
E-5351
Report Number: NAS 1.15:102541
Report Number: NASA-TM-102541
Report Number: E-5351
Accession Number
90N21399
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available