NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Due to the lapse in federal government funding, NASA is not updating this website. We sincerely regret this inconvenience.

Back to Results
Space Station Freedom environmental control and life support system phase 3 simplified integrated test detailed reportA description of the phase 3 simplified integrated test (SIT) conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) in 1989 is presented. This was the first test in the phase 3 series integrated environmental control and life support systems (ECLSS) tests. The basic goal of the SIT was to achieve full integration of the baseline air revitalization (AR) subsystems for Space Station Freedom. Included is a description of the SIT configuration, a performance analysis of each subsystem, results from air and water sampling, and a discussion of lessons learned from the test. Also included is a full description of the preprototype ECLSS hardware used in the test.
Document ID
19900013277
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Authors
Roberts, B. C.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Carrasquillo, R. L.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Dubiel, M. Y.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Ogle, K. Y.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Perry, J. L.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Whitley, K. M.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Date Acquired
September 6, 2013
Publication Date
May 1, 1990
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
NASA-TM-4204
NAS 1.15:4204
Report Number: NASA-TM-4204
Report Number: NAS 1.15:4204
Accession Number
90N22593
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available