Launch delay impact on the Galileo attitude control systemThe Galileo spacecraft was launched from the Space Shuttle in October 1989, using a two-stage inertial upper stage. The trajectory included flybys of Venus and earth for gravity assists. The mission duration increased to a total of 8 years rather than the original 4.5 years. The major impact of this new mission plan was on the thermal control design. A viable design was achieved, with one major attitude control constraint: the spacecraft antenna boresight must be pointed to within 14 deg of the sun whenever the spacecrat is within 1 AU of the sun, even in the presence of faults. Changes to hardware, software and operations strategies had to be made to handle the new and longer mission.
Document ID
19900034498
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Chodas, J. L. (Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Weisenberg, D. M. (JPL Pasadena, CA, United States)
Date Acquired
August 14, 2013
Publication Date
January 1, 1989
Subject Category
Astronautics (General)
Report/Patent Number
AAS PAPER 89-051Report Number: AAS PAPER 89-051
Meeting Information
Meeting: Annual Rocky Mountain Guidance and Control Conference