Space Station Freedom - A program updateA conceptual and programatic development status evaluation is presented for the NASA Space Station Freedom. A first Freedom-element launch by the Space Shuttle is planned for 1995, with completion of the assembly process by 1998. Man-tended capability is expected to be established by one of the early Space Shuttle assembly flights; a permanently manned capability is expected to be in place by 1996. This construction schedule fundamentally depends, however, on the availability of a replacement Space Shuttle Orbiter whose delivery is expected to occur in May 1991. Attention is given to the international-cooperation aspects of the program.
Document ID
19900046020
Acquisition Source
Legacy CDMS
Document Type
Reprint (Version printed in journal)
Authors
Raney, William B.
(NASA Space Station Freedom Program Office Reston, VA, United States)
Date Acquired
August 14, 2013
Publication Date
January 1, 1990
Publication Information
Publication: Acta Astronautica
Volume: 22
ISSN: 0094-5765
Subject Category
Astronautics (General)
Report/Patent Number
ISSN: 0094-5765
Accession Number
90A33075
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available