NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Intrepid: A Mission to PlutoA proposal for an exploratory spacecraft mission to Pluto/Charon system was written in response to the request for proposal for an unmannned probe to pluto (RFP). The design requirements of the RFP are presented and under the guidance of these requirements, the spacecraft Intrepid was designed. The RPF requirement that was of primary importance is the minimization of cost. Also, the reduction of flight time was of extreme importance because the atmosphere of Pluto is expected to collapse close to the Year 2020. If intrepid should arrive after the collapse, the mission would be a failure; for Pluto would be only a solid rock of ice. The topics presented include: (1) scientific instrumentation; (2) mission management, planning, and costing; (3) power and propulsion subsystem; (4) structural subsystem; (5) command, control, and communications; and (6) attitude and articulation control.
Document ID
19910006734
Acquisition Source
Headquarters
Document Type
Other
Authors
Behling, Michael
(Illinois Univ. Urbana-Champaign, IL, United States)
Buchman, Donald
(Illinois Univ. Urbana-Champaign, IL, United States)
Marcus, Andres
(Illinois Univ. Urbana-Champaign, IL, United States)
Procopis, Stephanie
(Illinois Univ. Urbana-Champaign, IL, United States)
Wassgren, Carl
(Illinois Univ. Urbana-Champaign, IL, United States)
Ziemer, Sarah
(Illinois Univ. Urbana-Champaign, IL, United States)
Date Acquired
September 6, 2013
Publication Date
May 1, 1990
Publication Information
Publication: Aerospace Vehicle Design, Spacecraft Section. Volume 1: Project Groups 1-4
Subject Category
Spacecraft Design, Testing And Performance
Accession Number
91N16047
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available