NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applicationsGuidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).
Document ID
19910011243
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Koenig, John C.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Billitti, Joseph W.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Tallon, John M.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
September 6, 2013
Publication Date
October 15, 1979
Subject Category
Energy Production And Conversion
Report/Patent Number
NASA-CR-183316
NAS 1.26:183316
JPL-5250-3-VOL-1
Report Number: NASA-CR-183316
Report Number: NAS 1.26:183316
Report Number: JPL-5250-3-VOL-1
Accession Number
91N20556
Funding Number(s)
CONTRACT_GRANT: NAS7-100
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available