NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Flight set 360L007 (STS-33) insulation component. Volume 3: Final releaseVolume 3 of this postfire report deals with the insulation component of the RSRM. The report is released twice for each flight set. The interim release contract date is on or before 60 days after the last field joint or nozzle to case joint is disassembled at KSC and contain the results of the KSC visual evaluation. The data contained in Volume 3 interim release supersedes the insulation data presented in the KSC 10 day report. The final release contract data is on or before 60 days after the last factory joint is disassembled at the Clearfield H-7 facility and contains the results of all visual evaluations and a thermal safety factor analysis. The data contained in the Volume 3 final release supersedes the interim release and the insulation data presented in the Clearfield 10 day report.
Document ID
19910011917
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Hicken, Steve
(Thiokol Corp. Brigham City, UT, United States)
Date Acquired
September 6, 2013
Publication Date
August 1, 1990
Subject Category
Spacecraft Propulsion And Power
Report/Patent Number
TWR-17546-VOL-3
NASA-CR-184091
L623-FY91-M020
NAS 1.26:184091
Report Number: TWR-17546-VOL-3
Report Number: NASA-CR-184091
Report Number: L623-FY91-M020
Report Number: NAS 1.26:184091
Accession Number
91N21230
Funding Number(s)
CONTRACT_GRANT: NAS8-30490
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available