National Transonic Facility statusThe National Transonic Facility (NTF) was operational in a combined checkout and test mode for about 3 years. During this time there were many challenges associated with movement of mechanical components, operation of instrumentation systems, and drying of insulation in the cryogenic environment. Most of these challenges were met to date along with completion of a basic flow calibration and aerodynamic tests of a number of configurations. Some of the major challenges resulting from cryogenic environment are reviewed with regard to hardware systems and data quality. Reynolds number effects on several configurations are also discussed.
Document ID
19910014820
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Mckinney, L. W.
(NASA Langley Research Center Hampton, VA, United States)
Bruce, W. E., Jr.
(NASA Langley Research Center Hampton, VA, United States)
Gloss, B. B.
(NASA Langley Research Center Hampton, VA, United States)
Date Acquired
September 6, 2013
Publication Date
April 1, 1989
Publication Information
Publication: Transonic Symposium: Theory, Application and Experiment, Volume 2
Subject Category
Research And Support Facilities (Air)
Accession Number
91N24133
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.