Development of a funding, cost, and spending model for satellite projectsThe need for a predictive budget/funging model is obvious. The current models used by the Resource Analysis Office (RAO) are used to predict the total costs of satellite projects. An effort to extend the modeling capabilities from total budget analysis to total budget and budget outlays over time analysis was conducted. A statistical based and data driven methodology was used to derive and develop the model. Th budget data for the last 18 GSFC-sponsored satellite projects were analyzed and used to build a funding model which would describe the historical spending patterns. This raw data consisted of dollars spent in that specific year and their 1989 dollar equivalent. This data was converted to the standard format used by the RAO group and placed in a database. A simple statistical analysis was performed to calculate the gross statistics associated with project length and project cost ant the conditional statistics on project length and project cost. The modeling approach used is derived form the theory of embedded statistics which states that properly analyzed data will produce the underlying generating function. The process of funding large scale projects over extended periods of time is described by Life Cycle Cost Models (LCCM). The data was analyzed to find a model in the generic form of a LCCM. The model developed is based on a Weibull function whose parameters are found by both nonlinear optimization and nonlinear regression. In order to use this model it is necessary to transform the problem from a dollar/time space to a percentage of total budget/time space. This transformation is equivalent to moving to a probability space. By using the basic rules of probability, the validity of both the optimization and the regression steps are insured. This statistically significant model is then integrated and inverted. The resulting output represents a project schedule which relates the amount of money spent to the percentage of project completion.
Document ID
19910016622
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Johnson, Jesse P.
(Morgan State Univ. Baltimore, MD, United States)
Date Acquired
September 6, 2013
Publication Date
September 1, 1989
Publication Information
Publication: Maryland Univ., The 1989 NASA-ASEE Summer Faculty Fellowship Program in Aeronautics and Research
Subject Category
Economics And Cost Analysis
Accession Number
91N25936
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available