NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Power systems testingThe Space Station Freedom (SSF) will give the U.S. a permanent manned presence in space in 1999. The SSF underwent its final design concept in 1991. Launches of hardware will begin in late 1995, and the SSF will become operational in the man tended configuration in 1997. Additional Space Shuttle flights between 1997 and 1999 will complete the SSF. Along with international partners, a crew of four astronauts will conduct long-term experimentation in the microgravity environment of the orbiting spacecraft. Lewis Research Center, along with its prime contractor, will provide the electrical power system (EPS) for SSF. Two major testing facilities at the Lewis Research Center will support the Lewis EPS. The Power Systems Facility provides test beds for life testing the station batteries and the power management distribution system testbed. This testbed simulates two channels of the EPS. The Space Power Facility at the Lewis Plum Brook Station is the largest vacuum chamber in the world. Within this chamber, a simulated space environment, testing of full-size EPS components will occur.
Document ID
19910020872
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Date Acquired
September 6, 2013
Publication Date
August 1, 1991
Subject Category
Ground Support Systems And Facilities (Space)
Report/Patent Number
NAS 1.15:104513
E-6383
NASA-TM-104513
Report Number: NAS 1.15:104513
Report Number: E-6383
Report Number: NASA-TM-104513
Accession Number
91N30186
Funding Number(s)
PROJECT: RTOP 474-74-10
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available