NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Space Station Freedom on-orbit crew time availability - A limited resourceBecause of the enormity, complexity, and duration of the Space Station Freedom (SSF) project, the available crew time is at a premium. This paper discusses the methodology for determining, early in the program, estimates of crew time which will be available within pressurized areas of intravehicular activity, from the First Element Launch (FEL) throughout the lifetime of the SSF. The methodology utilizes the baseline assembly sequence (November 1989) as a guideline. The total hours provided are categorized by periods, where a period is comprised of the time between two major SSF Program assembly milestones; e.g., FEL to Man Tended Capability (MTS), MTS to Permanently Manned Capability (PMC), or PMC to Assembly Complete (AC). After AC, total available crew time is presented on a yearly basis.
Document ID
19910025449
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Garegnani, Jerry J.
(NASA Space Operations Div. Reston, VA, United States)
Allen, Michelle C.
(Booz-Allen and Hamilton, Inc. Bethesda, MD, United States)
Date Acquired
August 14, 2013
Publication Date
September 1, 1990
Subject Category
Man/System Technology And Life Support
Report/Patent Number
AIAA PAPER 90-3653
Report Number: AIAA PAPER 90-3653
Accession Number
91A10072
Funding Number(s)
CONTRACT_GRANT: NASW-4300
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available