NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
ART/Ada design project, phase 1. Task 3 report: Test planThe plan is described for the integrated testing and benchmark of Phase Ada based ESBT Design Research Project. The integration testing is divided into two phases: (1) the modules that do not rely on the Ada code generated by the Ada Generator are tested before the Ada Generator is implemented; and (2) all modules are integrated and tested with the Ada code generated by the Ada Generator. Its performance and size as well as its functionality is verified in this phase. The target platform is a DEC Ada compiler on VAX mini-computers and VAX stations running the VMS operating system.
Document ID
19920001096
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Allen, Bradley P.
(Inference Corp. Los Angeles, CA., United States)
Date Acquired
September 6, 2013
Publication Date
October 24, 1988
Subject Category
Computer Programming And Software
Report/Patent Number
NAS 1.26:188945
NASA-CR-188945
Report Number: NAS 1.26:188945
Report Number: NASA-CR-188945
Accession Number
92N10314
Funding Number(s)
CONTRACT_GRANT: NCC9-16
PROJECT: RICIS PROJ. SE-19
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available