NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Network Control Center User Planning System (NCC UPS)NCC UPS is presented in the form of the viewgraphs. The following subject areas are covered: UPS overview; NCC UPS role; major NCC UPS functional requirements; interactive user access levels; UPS interfaces; interactive user subsystem; interface navigation; scheduling screen hierarchy; interactive scheduling input panels; autogenerated schedule request panel; schedule data tabular display panel; schedule data graphic display panel; graphic scheduling aid design; and schedule data graphic display.
Document ID
19920001835
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Dealy, Brian
(Computer Sciences Corp. Greenbelt, MD, United States)
Date Acquired
September 6, 2013
Publication Date
September 1, 1991
Publication Information
Publication: NASA. Goddard Space Flight Center, Space Network Control Conference on Resource Allocation Concepts and Approaches
Subject Category
Space Communications, Spacecraft Communications, Command And Tracking
Accession Number
92N11053
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available