NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
HipparcosThe primary objective of Hipparcos is to provide very accurate star map data and star position accuracies on the order of 2 arc seconds. Hipparcos was planned to be in a geostationary orbit, but due to failure of the apogee motor, it is currently in a high elliptical orbit and has a 10.8 hour period. Goldstone 26 m will provide 6-8 hours per day support for real-time telemetry and command. Mission-dependent equipment is required at Goldstone, and telemetry and command data will be transmitted from Goldstone to European Space Operations Control Center (ESOC) via satellite links. Operations support is scheduled to begin 12 Mar. 1990.
Document ID
19920003888
Acquisition Source
Legacy CDMS
Document Type
Reprint (Version printed in journal)
Date Acquired
September 6, 2013
Publication Date
October 1, 1991
Publication Information
Publication: JPL, California Inst. of Tech., Deep Space Network: Mission Support Requirements
Subject Category
Astronautics (General)
Accession Number
92N13106
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available