NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
STV fueling optionsLunar vehicles that will be space based and reusable will require resupply of propellants in orbit. Approximately 75 pct. of the total mass delivered to low earth orbit will be propellants. Consequently, the propellant management techniques selected for Space Exploration Initiative (SEI) orbital operations will have a major influence on the overall SEI architecture. Five proposed propellant management facility (PMF) concepts were analyzed and compared in order to determine the best method of resupplying reusable, space based Lunar Transfer Vehicles (LTVs). The processing time needed at the Space Station to prepare LTV for its next lunar mission was estimated for each of the PMF concepts. The estimated times required to assemble and maintain the different PMF concepts were also compared. The results of the maintenance analysis were similar, with co-orbiting depots needing 100 to 350 pct. more annual maintenance. The first few external tanks mating operations at KSC encountered many problems that could cause serious lunar mission schedule delays. The use of drop tanks on lunar vehicles increases by a factor of four the number of critical propellant interface disturbances.
Document ID
19920008197
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Flemming, Ken
(McDonnell-Douglas Space Systems Co. Washington, DC, United States)
Date Acquired
September 6, 2013
Publication Date
September 1, 1991
Publication Information
Publication: NASA, Washington, Beyond the Baseline 1991: Proceedings of the Space Station Evolution Symposium. Volume 1: Space Station Freedom, Part 2
Subject Category
Spacecraft Design, Testing And Performance
Accession Number
92N17415
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available