Spiral model pilot project information modelThe objective was an evaluation of the Spiral Model (SM) development approach to allow NASA Marshall to develop an experience base of that software management methodology. A discussion is presented of the Information Model (IM) that was used as part of the SM methodology. A key concept of the SM is the establishment of an IM to be used by management to track the progress of a project. The IM is the set of metrics that is to be measured and reported throughout the life of the project. These metrics measure both the product and the process to ensure the quality of the final delivery item and to ensure the project met programmatic guidelines. The beauty of the SM, along with the IM, is the ability to measure not only the correctness of the specification and implementation of the requirements but to also obtain a measure of customer satisfaction.
Document ID
19920015896
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 6, 2013
Publication Date
October 28, 1991
Subject Category
Computer Programming And Software
Report/Patent Number
NAS 1.26:184310
NASA-CR-184310
Report Number: NAS 1.26:184310
Report Number: NASA-CR-184310
Accession Number
92N25139
Funding Number(s)
CONTRACT_GRANT: NAS8-37680
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available