NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Maintaining the program balance, volumes 1 and 2In March of 1990, the NASA Administrator asked the Academy to perform a study to address the following questions: (1) has NASA contracted too much of its technical work; (2) has NASA's in-house technical capability eroded over time; (3) is in-house engineering and scientific work important to the development of scientists and engineers; and (4) is NASA still able to attract quality scientists and engineers. A panel from the Academy addressed each question separately and came up with the following recommendations: (1) prepare and issue guidance on technical functional areas reserved for in-house performance; (2) convert contracted technical functions to in-house performance if critical to agency programs; (3) provide policy guidance to the centers to retain in-house projects; (4) examine the project mix at each center against agency goals and objectives; (5) institute an annual critical review for all technical disciplines; (6) modify the agency's contractor accountability process; and (7) seek opportunities for greater delegation of resources and technical decision making.
Document ID
19920019868
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Finger, Harold
(National Academy of Public Administration Washington, DC, United States)
Date Acquired
September 6, 2013
Publication Date
January 1, 1991
Subject Category
Administration And Management
Report/Patent Number
NASA-CR-190269
NAS 1.26:190269
Report Number: NASA-CR-190269
Report Number: NAS 1.26:190269
Accession Number
92N29111
Funding Number(s)
CONTRACT_GRANT: NASW-4254
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available