NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Artemis program: Rover/Mobility Systems Workshop resultsInformation is given in viewgraph form on the Artemis Program Rover/Mobility Systems Workshop results. Topics covered include an outpost site survey and resource assessment for Mare Tranquillitatis (15 n, 22 E). Viable mobility systems appear to be capable of supporting a 1997 launch. Achieving the defined mission objectives within a 65 kg payload appears to be possible, although with limited capability.
Document ID
19920024070
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Weaver, Dave
(NASA Lyndon B. Johnson Space Center Houston, TX, United States)
Date Acquired
September 6, 2013
Publication Date
January 1, 1992
Publication Information
Publication: Third SEI Technical Interchange: Proceedings
Subject Category
Astronautics (General)
Accession Number
92N33314
Distribution Limits
Public
Copyright
Public Use Permitted.
Document Inquiry

Available Downloads

There are no available downloads for this record.
No Preview Available