EMU processing - A myth dispelledThe refurbishment-and-checkout 'processing' activities entailed by the Space Shuttle Extravehicular Mobility Units (EMUs) are currently significantly more modest, at 1050 man-hours, than when Space Shuttle services began (involving about 4000 man-hours). This great improvement in hardware efficiency is due to the design or modification of test rigs for simplification of procedures, as well as those procedures' standardization, in conjunction with an increase in hardware confidence which has allowed the extension of inspection, service, and testing intervals. Recent simplification of the hardware-processing sequence could reduce EMU processing requirements to 600 man-hours in the near future.
Document ID
19920048681
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Peacock, Paul R. (Hamilton Standard Houston, TX, United States)
Wilde, Richard C. (Hamilton Standard Windsor Locks, CT, United States)
Lutz, Glenn C. (NASA Johnson Space Center Houston, TX, United States)
Melgares, Michael A. (Boeing Aerospace Operations Houston, TX, United States)
Date Acquired
August 15, 2013
Publication Date
January 1, 1991
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
SAE PAPER 911348Report Number: SAE PAPER 911348
Meeting Information
Meeting: International Conference on Environmental Systems