NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Due to the lapse in federal government funding, NASA is not updating this website. We sincerely regret this inconvenience.

Back to Results
An advanced manned launch system conceptA two-stage fully reusable rocked powered concept is defined and analyzed in detail for the Advanced Manned Launch System missions. The concept elements include a Mach 3 staging unmanned glideback booster and a 149-ft long winged orbiter with an external payload canister with a 15-ft diameter and 30-ft long payload bay. The booster and orbiter main propulsion system is a lightweight derivative of the current Space Shuttle Main Engine. The primary mission is the Space Station Freedom logistics mission, 40,000-lb payload with two crew members and eight passengers. The structural design and material selection, the thermal protection system, the integral cryogenic tanks and insulation, the propulsion system, and the modular payload canister system are described. The ground and flight operations approach analysis, the manufacturing and certification plan, and the technology development requirements are also discussed.
Document ID
19920074636
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Stone, H. W.
(NASA Langley Research Center Hampton, VA, United States)
Piland, W. M.
(NASA Langley Research Center Hampton, VA, United States)
Date Acquired
August 15, 2013
Publication Date
August 1, 1992
Subject Category
Space Transportation
Report/Patent Number
IAF PAPER 92-0870
Report Number: IAF PAPER 92-0870
Accession Number
92A57260
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available