NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Pitot survey of exhaust flow field of a 2-D scramjet nozzle at Mach 6 with air or freon and argon used for exhaust simulationA pitot-rake survey of the simulated exhaust of a half-span scramjet nozzle model was conducted in the Langley 20-Inch Mach 6 Tunnel to provide an additional data set for computational fluid dynamics (CFD) code comparisons. A wind-tunnel model was tested with a 26-tube pitot rake that could be manually positioned along the mid-semispan plane of the model. The model configuration had an external expansion surface of 20 degrees and an internal cowl expansion of 12 degrees; tests were also performed with a flow fence. Tests were conducted at a free-stream Reynolds number of approximately 6.5 x 10(exp 6) per foot and a model angle of attack of -0.75 degrees. The two exhaust gas mediums that were tested were air and a Freon 12-argon mixture. Each medium was tested at two jet total pressures at approximately 28 and 14 psia. This document presents the flow-field survey results in graphical as well as tabular form, and several observations concerning the results are discussed. The surveys reveal the major expected flow-field characteristics for each test configuration. For a 50-percent freon 12 and 50-percent argon mixture by volume (Fr-Ar), the exhaust jet pressures were slightly higher than those for air. The addition of a flow fence slightly raised the pitot pressure for the Fr-Ar mixture, but it produced little change for air. For the Fr-Ar exhaust, the plume was larger and the region between the shock wave and plume was smaller.
Document ID
19930000883
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Authors
Monta, William J.
(NASA Langley Research Center Hampton, VA, United States)
Date Acquired
September 6, 2013
Publication Date
October 1, 1992
Subject Category
Aerodynamics
Report/Patent Number
NASA-TM-4361
L-17021
NAS 1.15:4361
Report Number: NASA-TM-4361
Report Number: L-17021
Report Number: NAS 1.15:4361
Accession Number
93N10071
Funding Number(s)
PROJECT: RTOP 505-59-40-03
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available