NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Requirements for the implementation of schedule repair technology in the Experiment Scheduling ProgramThe following list of requirements specifies the proposed revisions to the Experiment Scheduling Program (ESP2) which deal with schedule repair. These requirements are divided into those which are general in nature, those which relate to measurement and analysis functions of the software, those which relate specifically to conflict resolution, and those relating directly to the user interface. (This list is not a complete list of requirements for the user interface, but only a list of those schedule repair requirements which relate to the interface.) Some of the requirements relate only to uses of the software in real-time operations. Others are clearly for future versions of the software, beyond the upcoming revision. In either case, the fact will be clearly stated.
Document ID
19930008097
Acquisition Source
Legacy CDMS
Document Type
Other
Authors
Bullington, Stanley F.
(Mississippi State Univ. Mississippi State, MS, United States)
Date Acquired
September 6, 2013
Publication Date
December 1, 1992
Publication Information
Publication: Alabama Univ., 1992 NASA(ASEE Summer Faculty Fellowship Program
Subject Category
Systems Analysis
Accession Number
93N17286
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available