NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Development of vendor evaluation criteria and post-implementation considerations for MSFC center-wide executive information systemIn June 1991, the MITRE Corporation submitted a series of recommendations as part of a Marshall Space Flight Center (MSFC) Management Information System Requirements Study, initiated by the Information Systems Office (ISO). A major recommendation of the study was to develop an Executive Information System (EIS) for MSFC executives. ISO was directed, by center management, to proceed with the development of a Center-Wide Executive Information System. Existing EIS prototypes, developed by the Space Shuttle Projects Office and the Payload Projects Office, were reviewed. These existing MSFC prototypes were considered not to encompass the required functionality needed on a center-wide basis. A follow-up study by MITRE provided top-level system requirements. These were later incorporated into a final requirements specification document by Boeing Computer Support Services.
Document ID
19930008127
Acquisition Source
Legacy CDMS
Document Type
Other
Authors
Moynihan, Gary P.
(Alabama Univ. Huntsville, AL, United States)
Date Acquired
September 6, 2013
Publication Date
December 1, 1992
Publication Information
Publication: Alabama Univ., 1992 NASA(ASEE Summer Faculty Fellowship Program
Subject Category
Documentation And Information Science
Accession Number
93N17316
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available