NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Due to the lapse in federal government funding, NASA is not updating this website. We sincerely regret this inconvenience.

Back to Results
A logistics and potential hazard study of propellant systems for a Saturn 5 derived heavy lift (three-stage core) launch vehicleThe Bush Administration has directed NASA to prepare for a return to the Moon and on to Mars - the Space Exploration Initiative. To meet this directive, powerful rocket boosters will be required in order to lift payloads that may reach the half-million pound range into low earth orbit. In this report an analysis is presented on logistics and potential hazards of the propellant systems envisioned for future Saturn 5 derived heavy lift launch vehicles. In discussing propellant logistics, particular attention has been given to possible problems associated with procurement, transportation, and storage of RP-1, HL2, and LOX, the heavy lift launch vehicle propellants. Current LOX producing facilities will need to be expanded and propellant storage and some support facilities will require relocation if current Launch Pads 39A and/or 39B are to be used for future heavy noise-abatement measures. Included in the report is a discussion of suggested additional studies, primarily economic and environmental, which should be undertaken in support of the goals of the Space Exploration Initiative.
Document ID
19930010221
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Whitney, E. Dow
(University of Central Florida Orlando, FL, United States)
Date Acquired
September 6, 2013
Publication Date
September 1, 1992
Publication Information
Publication: NASA(ASEE Summer Faculty Fellowship Program
Subject Category
Spacecraft Propulsion And Power
Accession Number
93N19410
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available