NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Space Station Furnace Facility. Volume 3: Program cost estimateThe approach used to estimate costs for the Space Station Furnace Facility (SSFF) is based on a computer program developed internally at Teledyne Brown Engineering (TBE). The program produces time-phased estimates of cost elements for each hardware component, based on experience with similar components. Engineering estimates of the degree of similarity or difference between the current project and the historical data is then used to adjust the computer-produced cost estimate and to fit it to the current project Work Breakdown Structure (WBS). The SSFF Concept as presented at the Requirements Definition Review (RDR) was used as the base configuration for the cost estimate. This program incorporates data on costs of previous projects and the allocation of those costs to the components of one of three, time-phased, generic WBS's. Input consists of a list of similar components for which cost data exist, number of interfaces with their type and complexity, identification of the extent to which previous designs are applicable, and programmatic data concerning schedules and miscellaneous data (travel, off-site assignments). Output is program cost in labor hours and material dollars, for each component, broken down by generic WBS task and program schedule phase.
Document ID
19930014048
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 6, 2013
Publication Date
May 1, 1992
Subject Category
Spacecraft Instrumentation
Report/Patent Number
NASA-CR-192478
NAS 1.26:192478
Report Number: NASA-CR-192478
Report Number: NAS 1.26:192478
Accession Number
93N23237
Funding Number(s)
CONTRACT_GRANT: NAS8-38077
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available