NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Distributed project scheduling at NASA: Requirements for manual protocols and computer-based supportThe increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of Space Shuttle mission planning.
Document ID
19930016886
Acquisition Source
Legacy CDMS
Document Type
Other
Authors
Richards, Stephen F.
(Ambassador Coll. Big Sandy, TX, United States)
Date Acquired
September 6, 2013
Publication Date
December 1, 1992
Publication Information
Publication: NASA. Johnson Space Center, National Aeronautics and Space Administration (NASA)(American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program, 1992, Volume 2 13 p (SEE N93-26070
Subject Category
Computer Programming And Software
Accession Number
93N26075
Funding Number(s)
CONTRACT_GRANT: NGT-44-005-803
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available