NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
In-space operations for lunar and Mars space transfer vehiclesThe objective of this paper is to discuss the in-space operations required to process the lunar and Mars mission vehicles envisioned for the Space Exploration Initiative (SEI). Recent studies, which have examined the degree to which on-orbit operations change as a function of the Earth-to-orbit (ETO) launch vehicle size, identified a common set of on-orbit vehicle processing tasks, and generated functional requirements for in-space processing nodes are summarized in this paper. Timelines for on-orbit processing of two different lunar transfer vehicles (LTV's) were developed to compare a 'current practice,' labor-intensive EVA approach to ones utilizing telerobotics and advanced automation. LTV aerobrake concepts ranging from simple deployment to considerable assembly are compared. Similar timelines for the on-orbit processing of a nuclear Mars transfer vehicle (MTV) are also presented. Aerobrakes can be processed in a timely manner and should not be ruled out for SEI missions. The 'tall pole' time interval for on-orbit vehicle initial processing is the delivery of elements to orbit, not the processing tasks.
Document ID
19940007096
Acquisition Source
Legacy CDMS
Document Type
Reprint (Version printed in journal)
Authors
Raper, James L., Sr.
(NASA Langley Research Center Hampton, VA, United States)
Vargo, Rick C.
(McDonnell-Douglas Space Systems Co. Cocoa Beach, FL., United States)
Date Acquired
September 6, 2013
Publication Date
February 1, 1993
Publication Information
Publication: NASA. Johnson Space Center, Sixth Annual Workshop on Space Operations Applications and Research (SOAR 1992), Volume 2
Subject Category
Systems Analysis
Accession Number
94N11568
Funding Number(s)
CONTRACT_GRANT: NAS10-11400
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available