Constraint-based schedulingThe GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.
Document ID
19940019431
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Zweben, Monte
(NASA Ames Research Center Moffett Field, CA, United States)
Date Acquired
September 6, 2013
Publication Date
March 1, 1993
Publication Information
Publication: JPL, SpaceOps 1992: Proceedings of the Second International Symposium on Ground Data Systems for Space Mission Operations
Subject Category
Administration And Management
Accession Number
94N23904
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available