Electric power system test and verification programSpace Station Freedom's (SSF's) electric power system (EPS) hardware and software verification is performed at all levels of integration, from components to assembly and system level tests. Careful planning is essential to ensure the EPS is tested properly on the ground prior to launch. The results of the test performed on breadboard model hardware and analyses completed to date have been evaluated and used to plan for design qualification and flight acceptance test phases. These results and plans indicate the verification program for SSF's 75-kW EPS would have been successful and completed in time to support the scheduled first element launch.
Document ID
19940025618
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Authors
Rylicki, Daniel S.
(NASA Lewis Research Center Cleveland, OH, United States)
Robinson, Frank, Jr.
(NASA Lewis Research Center Cleveland, OH, United States)
Date Acquired
September 6, 2013
Publication Date
March 1, 1994
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
E-8241
NAS 1.15:106405
NASA-TM-106405
Report Number: E-8241
Report Number: NAS 1.15:106405
Report Number: NASA-TM-106405
Accession Number
94N30123
Funding Number(s)
PROJECT: RTOP 474-12-10
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available