Cost and schedule estimation study reportThis report describes the analysis performed and the findings of a study of the software development cost and schedule estimation models used by the Flight Dynamics Division (FDD), Goddard Space Flight Center. The study analyzes typical FDD projects, focusing primarily on those developed since 1982. The study reconfirms the standard SEL effort estimation model that is based on size adjusted for reuse; however, guidelines for the productivity and growth parameters in the baseline effort model have been updated. The study also produced a schedule prediction model based on empirical data that varies depending on application type. Models for the distribution of effort and schedule by life-cycle phase are also presented. Finally, this report explains how to use these models to plan SEL projects.
Document ID
19940030750
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Condon, Steve
(Computer Sciences Corp. Greenbelt, MD., United States)
Regardie, Myrna
(Computer Sciences Corp. Greenbelt, MD., United States)
Stark, Mike
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Waligora, Sharon
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Date Acquired
September 6, 2013
Publication Date
November 1, 1993
Subject Category
Computer Programming And Software
Report/Patent Number
NAS 1.26:189344
SEL-93-002
NASA-CR-189344
Report Number: NAS 1.26:189344
Report Number: SEL-93-002
Report Number: NASA-CR-189344
Accession Number
94N35256
Funding Number(s)
PROJECT: RTOP 552-00-00
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available